01 — Key Metrics
2.4km
Total Span
4
Traffic Lanes
210m
Pylon Height
82min
Time Saved
2030
Est. Completion
A 2.4km cable-stayed river crossing connecting two major economic hubs, cutting a 90-minute detour down to 8 minutes.
Total Span
Traffic Lanes
Pylon Height
Time Saved
Est. Completion
The Atlantic Mega Bridge is a twin-pylon cable-stayed crossing designed to withstand seismic activity, high wind loads, and heavy freight traffic while connecting two of the region's busiest port cities.
Deep-water caisson foundations anchor the structure to bedrock, while a fully instrumented monitoring system tracks load, vibration and deck movement in real time throughout its 100-year design life.
Talk to our engineering team about large-scale transport projects.
Book A Consultation